Design and Construction Resources
SUCF Program Directives - PDF Format
Introduction - PDF Format
1A Design Phase Guides
- 1A-1 Phase Report for Smaller Projects , Revised March 2003
- 1A-2 Program Verification Phase , Revised March 2003
- 1A-3 Architectural Concept Phase , Revised March 2003
- 1A-4 Schematic Design Phase , Revised March 2003
- 1A-5 Design Manual Phase , Revised March 2003
- 1A-6 Construction Document (Pre-Bid) Phase
- 1A-7 Bid Phase Requirements , Revised December 2008
- 1A-8 Constructability Review , Revised July 2006
- 1A-9 Bid Documents , Revised November 2006
- 1A-10 Construction Phase Requirements (reserved)
1B Code Requirement Guides
- 1B-1 Building Codes , Revised September 2009
1C General Procedures
- 1C-1 Definitions of Net and Gross Areas
- 1C-2 Specification of Materials , Revised
- 1C-3 Material and Color Selections
- 1C-4 Extra Compensation Authorization , Revised September 2003
- 1C-5 Subsurface Investigation Procedures
- 1C-6 Control Testing Laboratory Services
- 1C-7 Proposing Site Representatives
- 1C-8 Project Estimating , Revised January 2009
- 1C-9 Historic Preservation
- 1C-10 Coordination with Individual Campus Standards
- 1C-11 Project Meetings and Responses to Phase Comments
1D General Guides
- 1D-1 Unit Prices
- 1D-2 Demolition of Structures
- 1D-3 Governing Agency Submissions , Revised March 2003
- 1D-4 Construction Site Requirements , Revised June 2007
- 1D-5 Lead Remediation
- 1D-6 Asbestos Abatement
- 1D-7 Project Sign , Revised June 2007
- 1D-8 Air Permits - NYS and EPA Permitting Requirments for Air Contamination Sources , Revised April 2003
- 1D-9 Project Web Cams -
Division 2 - Civil/Site Directives
- 2-1 Sitework Overview
- 2-2 Campus Roads and Pavements
- 2-3 Site Utilities , Revised February 2008
- 2-4 Sedimentation and Erosion Control , Revised March 2003
- 2-5 Rock Excavation
- 2-6 Architectural Pavers and Concrete
- 2-7 Slope Design and Treatment
- 2-8 Seeding and Plantings
- 2-9 Exterior Walls and Stairs
- 2-10 Synthetic Turf System
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
- 5-1 Structural Steel , Revised September 2003
Division 7 -Thermal and Moisture Protection
- 7-1 Roofing and Reroofing , Revised April 2005
- 7-2 Agenda for Pre-roofing Conference
Division 8 - Doors and Windows
- 8-1 Door Hardware
- 8-2 Doors and Frames
- 8-3 Main Entrance Doors
- 8-4 Wood Windows
- 8-5 Window Cleaning
- 8-6 Curtain Walls
Division 10 - Specialties
Division 11 - Equipment
- 11-1 Food Service Equipment
- 11-2 Classifications and Symbols / Equipment Classification
- 11-3 Lockers
- 11-4 Laboratory Design Guidelines
- 11-5 Sound System Guidelines , Revised March 2003
Division 12 - Furnishings
Division 14 - Conveying Systems
- 14-1 Vertical Circulation - Currently Under Revision
Division 15 - Mechanical
- 15H-1 General HVAC Requirements , Revised February 2004
- 15H-2 Air Systems , Revised February 2010
- 15H-3 Hydronic Systems
- 15H-4 Hot Water and Steam Boiler Systems
- 15H-5 Chiller Systems
- 15H-6 High Temperature Hot Water Systems
- 15H-7 Special Air Conditioning and Ventilation
- 15H-8 Laboratory Design
- 15H-9 Commissioning , Revised March 2007
- 15H-10 Piping Types and Materials , Revised March 2010
- 15P-1 Natural Gas Service
- 15P-2 Acid Waste Piping , Revised February 2004
- 15P-3 Floor Receptacles
- 15P-4 Floor Drains
- 15P-5 Backflow Prevention Devices , Revised March 2004
- 15F-1 Fire Prevention - Sprinklers , Revised February 2004
Division 16 - Electrical
- 16-1 (reserved)
- 16-2 Ground Fault Protection Systems
- 16-3 Fire Alarm and Detection Systems , Revised April 2008
- 16-4 Conduit
- 16-5 Relocation of Telephone Cables and Equipment
- 16-6 Outdoor Lighting , Revised March 2003
- 16-7 Campus Electric Distribution System , Revised February 2008
- 16-8 Transformer Vault Ventilation
Division 27 - Communications
- 27-1 Communication Systems , Revised May 2007
As additional program directives become available, they will be added to this section of the Web site. If you have any questions concerning these Directives, contact your project's Design Coordinator shown on www.sucf.suny.edu/pdf/campstaf.pdf or call (518)689-2576.
*Certain versions of browsers experience difficulties with PDFs. Please visit www.adobe.com for more information.

