Design and Construction Resources
SUCF Program Directives - Word Format
Introduction - Word Format
1A Design Phase Guides
- 1A-1 Phase Report for Smaller Projects - Word Format, Revised March 2003
- 1A-2 Program Verification Phase - Word Format, Revised March 2003
- 1A-3 Architectural Concept Phase - Word Format, Revised March 2003
- 1A-4 Schematic Design Phase - Word Format , Revised March 2003
- 1A-5 Design Manual Phase - Word Format, Revised March 2003
- 1A-6 Construction Document (Pre-Bid) Phase - Word Format
- 1A-7 Bid Phase Requirements - Word Format, Revised June 2008
- 1A-8 Constructability Review - Word Format, Revised July 2006
- 1A-9 Bid Documents - Word Format, Revised November 2006
- 1A-10 Construction Phase Requirements (reserved)
1B Code Requirement Guides
- 1B-1 Building Codes - Word Format, Revised March 2003
- 1B-2 ADA Regulations - Word Format
- 1B-3 Lightning Protection - Word Format
- 1B-4 Earthquake Design Requirements - Word Format
- 1B-5 Special Structural Requirements for Academic Facilities - Word Format
- 1B-6 Energy Conservation Program Word Format, Revised February 2004
- 1B-7 Executive Order No. 111 (reserved) Word Format , Revised February 2007
1C General Procedures
- 1C-1 Definitions of Net and Gross Areas - Word Format
- 1C-2 Specification of Materials - Word Format
- 1C-3 Material and Color Selections - Word Format
- 1C-4 Extra Compensation Authorization - Word Format, Revised September 2003
- 1C-5 Subsurface Investigation Procedures - Word Format
- 1C-6 Control Testing Laboratory Services - Word Format
- 1C-7 Proposing Site Representatives - Word Format
- 1C-8 Project Estimating - Word Format
- 1C-9 Historic Preservation - Word Format
- 1C-10 Coordination with Individual Campus Standards - Word Format
- 1C-11 Project Meetings and Responses to Phase Comments - Word Format
1D General Guides
- 1D-1 Unit Prices - Word Format
- 1D-2 Demolition of Structures - Word Format
- 1D-3 Governing Agency Submissions - Word Format, Revised March 2003
- 1D-4 Construction Site Requirements - Word Format, Revised June 2007
- 1D-5 Lead Remediation - Word Format
- 1D-6 Asbestos Abatement - Word Format
- 1D-7 Project Sign - Word Format, Revised June 2007
- 1D-8 Air Permits - NYS and EPA Permitting Requirements for Air Contamination Sources - Word Format , Revised April 2003
- 1D-9 Project Web Cams - Word Format
Division 2 - Civil/Site Directives
- 2-1 Sitework Overview - Word Format
- 2-2 Campus Roads and Pavements - Word Format
- 2-3 Site Utilities - Word Format, Revised February 2008
- 2-4 Sedimentation and Erosion Control - Word Format, Revised March 2003
- 2-5 Rock Excavation - Word Format
- 2-6 Architectural Pavers and Concrete - Word Format
- 2-7 Slope Design and Treatment - Word Format
- 2-8 Seeding and Plantings - Word Format
- 2-9 Exterior Walls and Stairs - Word Format
- 2-10 Synthetic Turf System - Word Format
Division 3 - Concrete
- 3-1 Concrete - Word Format
- 3-2 Automated Concrete Batch Plants - Word Format
Division 4 -Masonry
- 4-1 Masonry Construction - Word Format
Division 5 - Metals
- 5-1 Structural Steel - Word Format, Revised September 2003
Division 7 - Thermal and Moisture Protection
- 7-1 Roofing and Reroofing - Word Format, Revised April 2005
- 7-2 Agenda for Preroofing Conference - Word Format
Division 8 - Doors and Windows
- 8-1 Door Hardware - Word Format
- 8-2 Doors and Frames - Word Format
- 8-3 Main Entrance Doors - Word Format
- 8-4 Wood Windows - Word Format
- 8-5 Window Cleaning - Word Format
- 8-6 Curtain Walls - Word Format
Division 10 - Specialties
- 10-1 Toilet Partitions - Word Format
- 10-2 Date Stones and Plaques - Word Format
Division 11 - Equipment
- 11-1 Food Service Equipment - Word Format
- 11-2 Classifications and Symbols / Equipment Classification- Word Format
- 11-3 Lockers - Word Format
- 11-4 Laboratory Design Guidelines - Word Format
- 11-5 Sound System Guidelines - Word Format , Revised March 2003
Division 12 - Furnishings
- 12-1 Carpeting - Word Format
- 12-2 Window Treatment - Word Format
Division 14 - Conveying Systems
- 14-1 Vertical Circulation - Currently Under Revision
Division 15 - Mechanical
- 15H-1 General HVAC Requirements - Word Format, Revised February 2004
- 15H-2 Air Systems - Word Format
- 15H-3 Hydronic Systems - Word Format
- 15H-4 Hot Water and Steam Boiler Systems - Word Format
- 15H-5 Chiller Systems - Word Format
- 15H-6 High Temperature Hot Water Systems - Word Format
- 15H-7 Special Air Conditioning and Ventilation - Word Format
- 15H-8 Laboratory Design - Word Format
- 15H-9 Commissioning - Word Format, Revised March 2007
- 15H-10 Piping Types and Materials - Word Format, Revised February 2006
- 15P-1 Natural Gas Service - Word Format
- 15P-2 Acid Waste Piping - Word Format, Revised February 2004
- 15P-3 Floor Receptacles - Word Format
- 15P-4 Floor Drains - Word Format
- 15P-5 Backflow Prevention Devices - Word Format, Revised March 2004
- 15F-1 Fire Prevention - Sprinklers - Word Format, Revised February 2004
Division 16 - Electrical
- 16-1 (reserved)
- 16-2 Ground Fault Protection Systems - Word Format
- 16-3 Fire Alarm and Detection Systems - Word Format, Revised April 2008
- 16-4 Conduit - Word Format
- 16-5 Relocation of Telephone Cables and Equipment - Word Format
- 16-6 Outdoor Lighting - Word Format, Revised March 2003
- 16-7 Campus Electric Distribution System- Word Format, Revised February 2008
- 16-8 Transformer Vault Ventilation - Word Format
Division 27 - Communications
- 27-1 Communication Systems - Word Format , Revised May 2007
As additional program directives become available, they will be added to this section of the Web site. If you have any questions concerning these Directives, contact your project's Design Coordinator shown on www.sucf.suny.edu/pdf/campstaf.pdf or call (518)689-2576.
*Certain versions of browsers experience difficulties with PDFs. Please visit www.adobe.com for more information.

