SUNY at Potsdam
Interior Rehabilitation of Flagg Hall
These are static photos of the project. You can also view a screen show that enables you to step through the static photos or you may have the screen show play for you.
Screen Show
![]() |
![]() |
![]() |
|
| Asbestos Abatement Lower Level 06/27/07 |
Furred Corridor with Metal Studs 07/11/07 |
Install Partition Wall for New Bathroom 07/13/07 |
|
![]() |
![]() |
![]() |
![]() |
| Student Commons New Veneer Plaster 08/08/07 |
Stair to Upper Level 08/08/07 |
Student Common Existing Fire Alarm Panel 08/08/07 |
Upper Level Corridor 08/08/07 |