SUCF Design Contracts for College at Oneonta
| Project | Description | Project Size | Architect | Next Phase | Bid Status |
|---|---|---|---|---|---|
| 09308 | Rehabilitation of Fitzelle Hall, Bldg. No. 26 | Over $10,000,000 | ARCHITECTURE + (518) 272-4481 | Schematic Design Report App | |
| 09322 | Replace HVAC/Domestic Hot Water Equipment, Instructional Resource Center | $1,000,000 - 2,500,000 | C & S ENGINEERS, INC. (315) 703-4266 | Construction Award | Bid Opened |
| 09331 | Replace VAT Flooring, Phase II | $250,000 - 500,000 | ARCHITECTURE + (518) 272-4481 | Design Manual Report Approval | |
| 09335 | Replace Medium Temperature Water Lines | $1,000,000 - 2,500,000 | LIZARDOS ENGINEERING ASSOCIATES P.C. (516) 484-1020 | Bid Opening | Advertised |
| 09343 | Replace Roof/Windows-Physical Education Building | $1,000,000 - 2,500,000 | ARCHITECTURE + (518) 272-4481 | Program Verification | |
| 09344 | Replace Cooling Tower/Transformer - Lee Hall | $250,000 - 500,000 | C & S ENGINEERS, INC. (315) 703-4266 | Construction Award | Bid Opened |
| 09820 | Rehabilitate Fine Arts Building, Ph II Commissioning | N/A | GENESYS ENGINEERING P.C. (914) 633-6490 | Complete Study | |
Last Updated 11/16/09 at 08:27:28 AM